Monday, March 28, 2011

Stairs, Roofing, Windows and Interior Framing

The roof is now completely on. Notice the ridge cap on the lower section. The ridge cap is installed on the upper section as of today, but I don't have a photo of that yet. All the windows are in as well.

Roof and windows. Front of house.

Interior framing.

No longer need a ladder to get to the second floor!!!!
Most of the remaining framing will be finished tomorrow. Exterior doors will go in this week, too. The next big phase will be the exterior siding. Plumbing should start soon. Then wiring.

Saturday, March 19, 2011

Interior Framing, Windows and Roof

Looks nice with a roof.


Framing for the upstairs bathroom and closets.

Downstairs bedroom windows.

Kitchen windows.

Saturday, March 12, 2011

Kitchen Wall, Insulation and Strapping

The insulation and strapping is now complete over the entire house, including the newly completed south kitchen wall. Next will be the roof, windows and doors and interior partitions. Once the interior partitions are framed the plumber can come back and then electrician can start. 


South kitchen wall. Not a bad view!
This time including the windows on the west side as well.