The two story section now has insulation and strapping on all the walls except above where the one story section connects to it. The strapping is nailed through the insulation and sheathing to the posts. It holds the insulation down and also provides a nailing surface for the vertical exterior siding. Notice also that the roof finally has Typar on it and so now snow removal is pretty much restricted to the outside of the house. |
No comments:
Post a Comment