9/14/10 Footings are in. Forms for frost walls begun.
Pouring the frost walls.
Walls with the forms removed.
9/20/10 Starting to back fill. The machine in the center is a compactor, which I had the pleasure of spending several hours behind. A lot like using a lawn mower, but much heavier.
9/21/10 Sewer lines inside the house being installed.
All the pipes that will go under the slab are now in. In addition to the sewer lines there are also the cold water lines and some electrical conduit. Back fill inside the house almost done. We ran out of dirt!!